Trail Day – April 29, 2017

Great trail day today, despite the rain. Had a good crew, 8 souls braved the weather. Repaired the boardwalk bridge at mile 23.5, did lots of drainage work between miles 20 and 22 as well as a massive Multiflora Rose removal project. Thanks to all those that helped!!